|
Post by pigeonpie on Mar 25, 2009 12:29:49 GMT
The adequacy of the Claustre del Carme, in its final phaseDrafting Mahón The project management and refurbishment of the environment Claustre del Carme now in its final phase, with the lighting of the sea front of the monuments which was approved by the Governing Board of the City Council Mahón January 20, 2009 and allotted to the SL in M. Polo 95,631.08 euros, a budget based on tender 96,743.64 euros. The direction of the work has been entrusted to Garcia Gemma Querol and its performance, which has a period of two months, workers have been hired 5. The financing of the action will be borne by the State Fund of Local Investment. Three basic questionsThe project addresses three issues: the illumination of the road through the installation of lighting on separate columns of the monumental facade, not to interfere, and, in contemplation of the building, the lighting of the building by means of projectors that sodium vapor is located right at the junction of the luminaries that light the road, and the lighting of the pergola which gives access to the mall. is also envisaged the provision of 10 to crosier throughout the pedestrian walkway. Each will have two foci oriented the building to provide power to the ornamental facade lighting. It is also envisaged placing six swimwear wall for lighting the pergola entrance to the cloister from the Plaza Miranda. Read more on this article
|
|